Projects

Back

 

                                                                                                                   Summer 2010 Service Engineer from Marine Engineering ApS is transferred by chopper to the area where service is performed.

 

                                                                                                                     Spring 2010
A look around the horizon in Brazilian waters, tells us there is a lot business goind on. It was possible to count 29 FPSO´s in the deep sea area. The need for AHTS vessel will increase in the future. Approximately 160 vessels within a time period of 10 Year, (Source: Petrobras news)

 

                                                                                                                December 2008
Marine Engineering ApS, installing VDR in the south chineese sea onboard the vessel "Gosport Maersk". The installation is cordinated by Hansbuch Marine A/S (www.hansbuch.dk)  

 

                                                                                                                November 2008

Marine Engineering ApS onboard the vessel "Tilda Kosan", installing FURUNO communication and navigation equipment. On her docking in Portugal, November 2008, Job is done in co-operation with Telenautic (Fredericia, DK) www.telenautic.dk

 

                                                                                                                   October 2008

Marine Engineering ApS onboard the newbuilding AHTS "Maersk Topper", indstalling FURUNO radio equipment on the vessels maiden voyage from Aalesund, Norway to Rio, Brazil. Maersk Topper is built on the concept "Clean Design" to reduce any pollution that will harm the environment

To Top